In our journey to shape the future of infrastructure, we take pride in assignments that showcase our expertise and commitment. Each featured assignment stands as a testament to our innovative solutions and dedication to excellence.

Project Feasibility Study

Project Planning & Techno-Economic Advisory

Conducting feasibility studies for Dam Toe Power Projects in Madhya Pradesh, focusing on the Suthaliya and Parbati projects in the Parbati Basin, and the Kotha Project in the Betwa Basin. 

Nyasim Khola HEP - 35 MW, Nepal

Project Management & Construction Support

Providing Project Management Services & Construction Support for the execution of 35 MW Nyasim Khola HEP.

Tashiding HEP - 97 MW, Sikkim

Due Diligence Studies

Carried out due diligence on project components, operation and maintenance, and performed ESG assessments to ensure compliance with environmental, safety, and governance standards.

Kutehr HEP - 240 MW, Himachal Pradesh

Contract Management & Administration

Provided Contract Management Services to the Project. We had also provided technical support in procuring equipment for the construction of Pressure Shaft. 

Jorethang Loop HEP - 96 MW, Sikkim

Due Diligence Studies

Carried out due diligence on project components, operation and maintenance, and performed ESG assessments to ensure compliance with environmental, safety, and governance standards.

Tarali PSP - 1500 MW, Maharashtra

Project Planning & Resource Management Advisory

Prepared Construction Methodology and carried out equipment planning along with project schedule review for 1500 MW Tarali Pumped Storage Project, Maharashtra. The main components of the project are – Upper and Lower Reservoir, Concrete Faced Rockfill Dam (CFRD), HRT, Pressure Shaft, Surge Shaft and Surface Powerhouse etc.

Arun-III HEP - 900 MW, Nepal

Project Planning, Contract Management & Administration

  • Carried out Due Diligence Studies & prepared Construction Schedule for the 900 MW Arun-III HEP, Nepal. The project consists of a 70m high concrete Gravity Dam with Five Sluice Gates, four underground Desilting Basins, a 9.5m dia., 11.74 km long HRT followed by 9.5m dia. two steel-lined Pressure Shafts and four Penstocks, an Underground Powerhouse housing 4 TG units of 225 MW capacity each, a 192 m long, 10 m dia. Tailrace Tunnel and a 300 km long 400 kV Transmission Line to India.
  • Package C2: Carried out Rate Analysis for BOQ items due to scope deviation in respect of Package C2, Arun-III HEP, Nepal.
  • Package C5: Provided Contract Management Services for the execution of Package C5 (Hydro-Mechanical Works), Arun-III HEP, Nepal.

Dhaulasidh HEP - 70 MW, Himachal Pradesh

Due Diligence Studies

Provided Contract Management Services for the Project.  The Project consists of Reservoir, Surface Penstocks, Surface Powerhouse housing 2 Units of capacity 35 MW each and a Tailrace Channel.

Budhi Ganga HEP - 20 MW, Nepal

Project Management Consultancy

Provided Project Management Consultancy services to the Project. The main Project components are Concrete Gravity Dam, Head Race Tunnel, Surge Shaft, Underground Pressure Shaft, Surface Powerhouse, Tailrace Tunnel and Transmission Line.

Yammeng HEP - 15 MW, Arunachal Pradesh

Due Diligence Studies & Techno-Economic Advisory

Reviewed the Detailed Project Report (DPR) and cost estimates, and conducted thorough due diligence studies on hydrology, power potential, geology, and risk assessment to ensure project viability.

Kol Dam HEP - 800 MW, Himachal Pradesh

Procurement Management & Advisory

Review of Estimates for the Dam Rehabilitation and Improvement of Project (DRIP) Works for the NTPC’s 800 MW Kol Dam Hydroelectric Project in Himachal Pradesh.

Irrigation Projects, Madhya Pradesh

Contract Management & Administration

Provided Contract Management Services for the following Irrigation Projects in Madhya Pradesh

Maa Ratangarh

Teonthar Flow

Bahuti

Majhgawan Branch Canal

Bahari Canal Network

Pench Diversion

Bina Micro

Garha Medium Lift

Gond

Parbati Pipe Network System

Chhindwara Complex

Suthaliya

Lower ORR

 

Ratle HEP - 800 MW, Jammu & Kashmir

Project Planning

Prepared Construction Methodology and performed Rate Analysis for Roller Compacted Concrete (RCC) for 800 MW Ratle HEP, Jammu & Kashmir.  The main components of the project are – Reservoir, Roller Compacted Concrete Gravity Dam, Pressure Shaft, Underground Powerhouse, Surge Chamber, Tailrace Tunnel, Pothead Yard, etc.

Kundah PSP - 500 MW, Tamil Nadu

Contract Management & Administration

Carried out Review of the Contract for Package – I (Construction of Powerhouse Cavern, Transformer Cavern, Tailrace Tunnel, Switchyard Foundation, etc.) and Package-II (construction of HRT, Intake, Surge Shaft, Pressure Shaft, etc.) in respect of the 500 MW Kundah Pumped Storage Project for Patel Engineering Ltd.

Khadakwasla-Fursungi Tunnel Project, Maharashtra

Project Planning

Carried out the Review Works for Khadakwasla Dam – Fursungi water Tunnel Project. Also, we had prepared the Construction Methodology for Concrete Face Rockfill Coffer Dam for the Project. The Project was aiming to carry water from the Khadakwasla Dam to Fursungi Village through a 34 km long water conductor tunnel.

Lower Subansiri - 2000 MW, Arunachal Pradesh

Project Planning

Carried out Due Diligence & prepare Dam Construction Schedule for the 2000 MW Lower Subansiri HEP, Arunachal Pradesh.  Subansiri HEP is a run-of-the-river Project. The Project consists of a reservoir having capacity of 205 MCM, 133 m High Gravity Dam, Head Race Tunnel, Pressure Shaft, Underground Powerhouse, Surge Chamber, Tailrace Tunnel & Switchyard.

Boniyar HEP - 8 MW, Jammu & Kashmir

Due Diligence Studies

Carried out Due Diligence studies for Boniyar HEP.

Hewa Khola - 24 MW, Nepal

Project Management Consultancy

Provided Project Management Services for the rehabilitation works of 24 MW Hewa Khola HEP, Nepal

Naitwar Mori HEP - 60 MW, Uttarakhand

Contract & Claims Management

Provided Contract Management Services for the construction of Hydro-Mechanical Works of Naitwar Mori HEP, Uttarakhand.  The main project components Barrage, Head Race Tunnel, Penstock, Surface Powerhouse, Tailrace Tunnel, etc.

Kollimalai HEP - 20 MW, Tamil Nadu

Contract & Claims Management

Provided Contract Management Services for the 20 MW Kollimalai HEP, Tami Nadu.  The Project mainly consists construction of Forebay, Power Tunnel, Pipe Tunnel, Gate Shaft, Surge Shaft, Valve Huse, Penstock, Powerhouse, Tailrace Tunnel, etc.

Khandheri HEP - 2 MW, Himachal Pradesh

Due Diligence Studies & Techno-Economic Advisory

Carried out Due Diligence Studies and Detailed Project Report updating works for the project. Khanderi HEP is a run-of-the-river project. The main Project components are; HRT, Surge Shaft, Penstock, Surface Powerhouse, Tailrace Tunnel, etc.

Sanjen HEP - 44 MW, Nepal

Contract Management & Administration

Provided Contract Management services for the 44 MW Sanjen HEP, Nepal.  Sanjen HEP is a run-of-the-river project. Project involved the construction of 3.5 m dia. & 3629 m long HRT, 5.5 m dia. & 55 m deep Surge Shaft, 1018 m long Penstock, Surface Powerhouse and Tailrace Tunnel.